浅析EPC模式下设计阶段施工安全风险管理体系

         

摘要

EPC模式,即为工程总承包模式,指把工程所有的任务统一承包下来,包括:工程的设计、设备材料的采购以及工程施工等所有项目。近些年EPC模式在国内快速流行。在EPC模式下,原有的安全风险管理系统早已不能满足要求,因此如何在工程总承包模式下,控制好安全风险,把安全风险降到最低成变得尤为重要,在工程中的安全危险最重要的阶段在于设计施工阶段,因此研究设计阶段施工安全风险管理体系具有重要的现实意义。%EPC model, which is short for Engineering Procurement Construction, the project will contract with all tasks, which include:project design, equipment and materials procurement and construction of all projects. In recent years, EPC model is very popular in china. In EPC mode, security risk management system is not the original meet the requirements, so how in the engineering general contracting mode, control the security risk, the security risk to a minimum to become particularly important, safety risk in the project is the most important stage in the construction design stage, so the research on safety risk management system of construction the design phase has the important practical significance.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号