本文以吴起油田开发为背景,以降低吨油成本、井位优化等为目的,结合吴起油田实施跟踪情况,从产建区块的确定、超前注水的开展、随钻地质研究调整、水平井试验的开展、开发成本的降低、新井生产时效的提高等方面分析对比总结经验,得出一些优化开发井位部署及跟踪实施行之有效的方法。%Based on the background of the Wuqi oilfield development, in order to reduce the tons of oil cost and optimize well location, the determination of capacity building blocks, development of advanced water injection, drilling geological adjustment, horizontal well test, cost reduction and the improvement of new wells production efficiency are analyzed combined with the Wuqi oilfield tracking. Finally the effective method to optimize well placement and the tracking of implementation is summed up.
展开▼