浅谈苏里格气田道路沙基施工工艺

         

摘要

随着长庆气田规模的逐渐扩大,应急抢险、气田开发等车辆交通量也随之加大,特别是大型气田专用车辆增加迅速,原有开发初期简易道路已不适应气田生产需要,因此,近几年气田抢险道路升级成沥青碎石道路,但如何能保证在沙漠边缘地貌施工公路质量是关键,本文举例苏48-5集气站进站道路工程路基施工做法提供一些浅薄经验。%With the gradual expansion of the scale of Changqing gas field, vehicle traffic volume is increasing because of emergency rescue and gas field development, especially the large special vehicle of gas fields is increased rapidly. So the original simple road built in the initial stage of development has not adapted to the gas field production. In recent years, the road for emergency rescue is upgraded to asphalt macadam road, but how to ensure the road construction quality under the desert edge landscape is the key. This article introduces the roadbed construction practices of Su 48-5 gas gathering station to provide some experience.