This paper proposes the method of combining the activity based costing (law of ABC) with mathematical programming to solve the decision problem of constructor's evaluation and choice, the research determines the standards set and weight which are chosen by constructor, then builds a mathematical programming model, at last calculation is maded by combining with construction case.%本文提出用作业成本法(ABC法)与数学规划相结合的方法来解决施工方评价和选择的决策问题,研究确定了施工方选择的准则集以及权重,建立了数学规划模型,最后结合案例进行了计算.
展开▼