贵州广播电视台传输机房搬迁实施方案

         

摘要

According to the annual planning requirements,the two phase of the total control room will be put into use.After the completion of the two HD computer room broadcast system,the transmission room TV system will be moved to the two phase of the total control room.In order to ensure the security of the new system TV signal transmission and the successful completion of the new system construction of the final relocation of the battle,the transmission department held a number of technical seminars.Combined with the actual situation of the station,a set of high security,high quality,high efficiency as one of the relocation program,to ensure that the transmission room to the main control room relocation work smoothly.%按照年度规划要求,贵州广播电视台二期总控机房即将投入使用.在二期高清机房播出系统切割顺利完成后,传输机房电视系统就将搬迁到二期总控机房工作.为保证新系统电视信号的传输安全以及新系统建设搬迁这一攻坚战的顺利完成,贵州台传输科多次召开技术座谈会,并结合台里实际情况,制定出一套高安全、高质量、高效率的搬迁方案,保证了传输机房向总控机房搬迁工作的顺利进行.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号