龙开口水电工程建设实施阶段造价管理综述

         

摘要

水电建设投资大,工期长,要求其工程造价管理更加科学、严谨.龙开口水电站项目在建设实施阶段对工程造价实行“静态控制、动态管理”.从主体工程分标规划、招标管理、设计管理和优化、合同管理、造价控制基础工作和造价审计等几个方面对龙开口工程造价管理进行了详细的阐述,并提出一系列科学合理的控制措施,为工程的顺利实施提供了保证.%The construction cost of hydropower engineering needs more scientific and rigorous management because of long construction period and substantial investment. The cost management and control in construction stage of Longkaikou Hydropower Station Project is implemented according to the principle of "Static control and dynamic management". The construction cost management of Project is introduced from the aspects of tender planning of main structures, tender management, design management and optimization, contract management, basic information for cost control and cost audit, and a series of control measures are also proposed. These management and control measures provide a guarantee for the smooth construction of project.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号