首页> 中文期刊> 《水科学与水工程》 >Risk calculation method for complex engineering system

Risk calculation method for complex engineering system

         

摘要

This paper presents a rapid and simple risk calculation method for large and complex engineering systems, the simulated maximum entropy method (SMEM), which is based on integration of the advantages of the Monte Carlo and maximum entropy methods, thus avoiding the shortcoming of the slow convergence rate of the Monte Carlo method in risk calculation. Application of SMEM in the calculation of reservoir flood discharge risk shows that this method can make full use of the known information under the same conditions and obtain the corresponding probability distribution and the risk value. It not only greatly improves the speed, compared with the Monte Carlo method, but also provides a new approach for the risk calculation in large and complex engineering systems.

著录项

  • 来源
    《水科学与水工程》 |2011年第3期|345-355|共11页
  • 作者单位

    Renewable Energy School, North China Electric Power University, Beijing 102206, P. R. China;

    Renewable Energy School, North China Electric Power University, Beijing 102206, P. R. China;

    Renewable Energy School, North China Electric Power University, Beijing 102206, P. R. China;

    Renewable Energy School, North China Electric Power University, Beijing 102206, P. R. China;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类
  • 关键词

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号