首页> 中文期刊> 《世界桥梁》 >宽幅预应力混凝土斜拉桥施工阶段剪力滞分析

宽幅预应力混凝土斜拉桥施工阶段剪力滞分析

         

摘要

The Jinqiao Bridge in Wuhan is a single pylon prestressed concrete cable-stayed bridge with span arrangement of (138 + 81 + 41) m and with double cable planes .The main girder adopts the separated double-side box cross section with variable width and the widest part is 49 .899 m .The main span is constructed by the cantilever cast method ,while the side spans are cast on scaffoldings .In order to examine the law of stress distribution at different locations of the main girder cross section and to guide the construction control and monitoring of the bridge ,the ANSYS was used to set up the full-scale model of the bridge to simulate the construction process of the main girder ,and analyze the shear lag effect in the top and bottom plates of the front section of the MB3 and MB2 segments under different load cases during the construction process of the MB6 segment .The results shows that the girder of the bridge is broad and the shear lag effect is dis -tinct ,and the shear lag effect in the top plate is much more noticeable than that in the bottom plate ,the prestress has very limited effect on the shear lag effect of the cross section ,the prestress shows more significant effect on the cross section shear lag effect in the vicinity of the prestress acting zone near the pylon . And concentrated load also has greater influence on the shear lag effect .%武汉市金桥为(138+81+41) m 的独塔双索面预应力混凝土斜拉桥,主梁采用变宽分离式双边箱截面,最宽处宽49.899 m ,主跨和边跨分别采用悬臂浇筑和支架浇筑法施工。为了解主梁横截面各位置应力的分布规律,指导该桥施工监控,采用 ANSYS 建立实体模型,模拟主梁的施工过程,对 MB6节段施工过程中各工况下 MB2和 MB3节段前端截面的顶、底板的剪力滞效应进行分析。结果表明:该桥主梁较宽,剪力滞效应比较明显,其中顶板的剪力滞效应相对于底板更加明显;预应力对截面剪力滞的影响有限,但近塔端越接近预应力作用范围的区域截面剪力滞受到预应力的影响越大;集中荷载对剪力滞效应影响较大。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号