首页> 中文期刊> 《人民长江》 >PFWST-150-6.3调速器在大岗山电站的应用

PFWST-150-6.3调速器在大岗山电站的应用

         

摘要

水轮机调速器是整个水力发电过程的参与者和执行者,频繁的控制和调节使其成为水力发电系统中故障多发的设备之一。为此,在大岗山水电站水轮机调速器的选型中开展了一系列试验,以检测运行中水轮机调速器的工作状态及性能。最终选定了4台全数字式PFWST-150-6-3调速器,与水电站计算机监控系统相配合,可完成对发电机组的控制运行。对调速器的结构、工作原理及主要设备参数进行了介绍。%Turbine governor plays a significant role in the whole hydropower generation, and is one of fault-prone equipments due to the frequent control and regulation. A series of tests for selection of turbine governor in Dagangshan Hydropower Station were carried out to test the working situation and performance during operation. Finally, 4 PFWST-150 -6. 3 microcomputer governors were chosen to control the operation of generator units by co-working with the computer monitoring system. The paper introduces the structure, type selection, parameters and operation rules of governor in Dagangshan Hydropower Station.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号