三峡工程设计及施工进展与展望

         

摘要

The construction of the TGP has proceeded smoothly since its commencement of construction in 1994 and the construction quality is good in general. The construction proceeds in accordance with the master project schedule in preliminary design approved by the central government and the investment can be controlled within the total budget of the preliminary design. The Changjiang Water Resources Commission, taking charge of the general design jobs of the TGP, has consistently paid attention to the project quality in the first place and carried out large amount of investigation, design and scientific research work. This paper makes an overall summarization and presentation on important technical issues in the design, such as dam, powerhouse structure, permanent ship locks, ship lift, project safety monitoring, main river closure and the 2nd stage cofferdam, mechanical and electric design etc., and put forwards a lot of suggestions about optimizing design schemes and measures for smoothing away construction difficulties in accordance with construction progress.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号