舟山市定海区白泉大闸重建工程建设技术

         

摘要

The Baiquan sluice is reconstructed at the long mad between Zhoushan Power Plant and Diaolang Reclamation Project. The sluice engineering was influenced by the surrounding power plant and buildings, especially the 24 - hour continuously drainage of cooling water from power plants can not be influenced. The narrow construction site, soft foundation and lots of surrounding constructions increased the difficulty in engineering arrangement and construction. The eomtruetion adopted the proper engineering techniques in the light of local conditions to ensure the construction quality and time schedule. This construction was fully acknowledged by its related people.%舟山市定海区白泉大闸重建工程位于舟山电厂和钓浪围垦工程之间的狭长的浦道上,水闸建设受周边电厂和建筑物的影响,尤其是不能影响电厂原有冷却排水口24 h不间断的排水。工程场地狭窄、地基软弱,周边敏感建筑物多,工程总体布置和施工难度大。工程因地制宜采用合适的工程技术,保证了工程建设的质量和进度,得到了工程有关各方的充分肯定。