首页> 外文期刊>IEEE Aerospace and Electronic Systems Magazine >The defense acquisition system too late for the scalpel; bring outthe meat axe!
【24h】

The defense acquisition system too late for the scalpel; bring outthe meat axe!

机译:国防采购系统对手术刀来说太迟了;带出肉斧!

获取原文
获取原文并翻译 | 示例
           

摘要

The problems discussed include that associated with the requirements process which leads to overspecification and an overly rigid approach to development, and a procurement system which is bloated and grossly inefficient. The bureaucracy in the DoD acquisition system has grown steadily from the 1960's to 1990's. Each problem encountered, and there have been serious ones, has resulted in the addition by the DoD or Congress of another wicket to get through, another set of unended peripheral tasks, another layer of checks, meetings, reports. Each addition was an intended improvement which in the long run has only made things worse. The DoD rightly asked for greater reliability and the reliability/maintainability/availability RMA, cult was born. Recommendations dealing with these problems are discussed
机译:所讨论的问题包括与需求过程相关的问题,导致过高的规格要求和过于僵化的开发方法,以及采购系统肿且效率低下。国防部采购系统中的官僚机构从1960年代到1990年代稳步增长。遇到的每一个问题,而且曾经是严重的问题,都导致国防部或国会增加了另一门检票口,以解决另一组未完成的外围任务,另一层检查,会议和报告。每次添加都是预期的改进,从长远来看只会使情况变得更糟。国防部正确地要求更高的可靠性,而可靠性/可维护性/可用性RMA正是天生的。讨论了解决这些问题的建议

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号