...
【24h】

Chillers Install Goes Modular

机译:冷水机安装模块化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The ability to meet a fast-track, multi-phased construction schedule and energy-efficiency goals were critical factors in the selection of a modular central plant to air condition Chaparral High School in Scottsdale, Ariz. Beating the desert heat and quiet operation were also considerations. When all phases are complete, the new campus will span approximately 320,000 square feet across nearly a dozen buildings, some old and some new.
机译:满足快速,多阶段施工进度和能效目标的能力是选择模块化中央工厂对空调进行通风的关键因素,该中心位于亚利桑那州斯科茨代尔的查帕拉尔高中,同时还克服了沙漠热和安静运行的问题。注意事项。当所有阶段完成后,新校园将占地约320,000平方英尺,覆盖近十二栋建筑,其中一些是旧的,有些是新的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号