首页> 外文期刊>Air Force Magazine >The Tanker Imperative
【24h】

The Tanker Imperative

机译:油轮势在必行

获取原文
获取原文并翻译 | 示例
           

摘要

The KC-46 next generation tanker program is entering the often-problematic stage in a military aircraft's development program. It must move beyond being a "paper airplane" and actually prove its capabilities in the air with real metal, electronics, and composites. Early results have been mixed. A KC-46 test aircraft flew for the first time at the end of 2014, beating a deadline by days, but Boeing has also recently announced the program has gone $808 million over the company's budget thus far. This cost overrun is Boeing's problem (not USAF's or the taxpayers') because the KC-46 program is a firm, fixed-price contract. In fact, Boeing is believed to have deliberately underbid the price to win the contract-on the expectation that KC-46 work would later lead to other sales for the company. USAF is watching the progress very closely. The KC-46 is one of the service's top three modernization priorities, along with the F-35 strike fighter and the Long-Range Strike Bomber. An often-overlooked flying gas station mission holds this high-priority status for good reason.
机译:KC-46下一代加油机计划已进入军用飞机开发计划中经常出现问题的阶段。它必须超越“纸飞机”的范畴,并真正用真正的金属,电子产品和复合材料在空中证明其功能。早期结果好坏参半。一架KC-46试飞机在2014年底首次飞行,比截止日期提前了几天,但波音公司最近还宣布,该计划迄今已超出公司预算8.08亿美元。这笔费用超支是波音公司的问题(不是美国空军或纳税人的问题),因为KC-46计划是一项固定的固定价格合同。实际上,据信波音故意低价以赢得合同-期望KC-46的工作以后会为公司带来其他销售。美国空军正在密切关注进展情况。 KC-46与F-35打击战斗机和远程打击轰炸机一样,是该服务的三大现代化重点之一。一个经常被忽视的飞行加油站任务具有充分的优先地位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号