首页> 外文期刊>Air Force Magazine >Playing the Numbers
【24h】

Playing the Numbers

机译:玩数字

获取原文
获取原文并翻译 | 示例
           

摘要

The Air Force plans to radically shift funding priorities in its next budget to pay forfuture network connectivity to support its vision of multi-domain command and control (MDC2). For example, it might surrender some of its most heavily worn B-1 bombers, and possibly retire F-15Cs and older F-16s, in order to free up funding to build a mesh-network combat cloud. The idea is to accept additional risk today in orderto ensure less risk tomorrow. But this strategy itself is a high-risk endeavor. Historically, when the Air Force attempted similartrades, they backfired: The service ended up losing both current capability and future funding. The Air Force can ill afford such a lose-lose scenario.
机译:空军计划在下一个预算中从根本上改变资金优先级,以支付未来的网络连接,以支持其多域指挥与控制(MDC2)的愿景。例如,它可能会交出一些磨损最严重的B-1轰炸机,并可能退役F-15C和较老的F-16,以释放资金来建立网状网络作战云。想法是今天接受更多的风险,以确保明天的风险降低。但是,这种策略本身就是一项高风险的工作。从历史上看,当空军尝试类似的交易时,他们适得其反:该服务最终失去了当前的能力和未来的资金。空军无法承受这种输球的局面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号