...
首页> 外文期刊>Air International >LEAP-1B Flight Tests Begin
【24h】

LEAP-1B Flight Tests Begin

机译:LEAP-1B飞行测试开始

获取原文
获取原文并翻译 | 示例
           

摘要

CFM International has started flight testing the Boeing 737 MAX'S LEAP-1B engine. The powerplant was flown aboard GE Aviation's 747 flying test-bed from the GE Aviation Flight Test Operations facility in Victorville, California, on April 29 during a five-hour, 30-minute flight. Testing will evaluate gauge engine operability, stall margin, performance, emissions and acoustics, and validate technologies such as the woven carbon fibre composite fan, ceramic matrix composite shrouds in the high-pressure turbine and titanium aluminide blades in the low-pressure turbine. The target is to certify the LEAP-1B next year.
机译:CFM International已开始对波音737 MAX的LEAP-1B发动机进行飞行测试。该动力装置于4月29日从加利福尼亚州维克多维尔的GE飞行测试运营机构登上了GE Aviation 747飞行试验台,飞行时间为5小时30分钟。测试将评估发动机的可操作性,失速裕度,性能,排放和声学,并验证诸如编织碳纤维复合材料风扇,高压涡轮中的陶瓷基复合材料导流罩以及低压涡轮中的铝化钛叶片之类的技术。目标是明年对LEAP-1B进行认证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号