...
首页> 外文期刊>Aluminium >Successful start-up of the fume treatment centre at Ras Al Khair aluminium smelter
【24h】

Successful start-up of the fume treatment centre at Ras Al Khair aluminium smelter

机译:Ras Al Khair铝冶炼厂烟气处理中心的成功启动

获取原文
获取原文并翻译 | 示例
           

摘要

Two FTC's were built in Ras Al Khair, Kingdom of Saudi Arabia, as part of the Ma'aden aluminium complex. These FTC's treat the fumes of two anode bake furnaces that supply anodes to the 740,000 tpy aluminium smelter. FTC 2 was commissioned in October 2012 and is currently running at full capacity. The cold commissioning of FTC 1 was done in January 2013, and hot commissioning took place in June 2013. As with all startups, there were some challenges to overcome, but currently FTC 2 is fully operational and FTC 1 is running at about 50% of its capacity because not all fires at the anode bake furnace 1 are in operation yet. Both FTCs are performing satisfactory. FTC 2 performance tests have taken place in the first week of July 2013.
机译:作为Ma'aden铝工厂的一部分,在沙特阿拉伯王国的Ras Al Khair建造了两个FTC。这些FTC处理两个阳极烘烤炉的烟气,这两个阳极烘烤炉为74万吨/年的铝冶炼厂提供阳极。 FTC 2于2012年10月投入使用,目前已满负荷运行。 FTC 1的冷调试于2013年1月完成,而热调试于2013年6月进行。与所有初创公司一样,有一些挑战需要克服,但是FTC 2现已全面运行,而FTC 1的运行率约为50%。其容量是因为还没有在阳极烘烤炉1上进行所有燃烧。两家FTC的表现都令人满意。 FTC 2性能测试已在2013年7月的第一周进行。

著录项

  • 来源
    《Aluminium》 |2013年第9期|5052-53|共3页
  • 作者

    J. de Weerdt; P. Klut;

  • 作者单位

    Danieli Corus B.V., Velsen-Noord, The Netherlands;

    Danieli Corus B.V., Velsen-Noord, The Netherlands;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号