...
【24h】

Never assume anything

机译:永远不要承担任何责任

获取原文
获取原文并翻译 | 示例
           

摘要

Planning load handling and lift activities followed by a review prevents and minimizes loss of life, injury and property damage. Additionally, a review provides guidance to all personnel involved or responsible for the safety of the load handling activities. According to ASME P30 the following should be considered when writing a lift plan. 1. Potential hazards to persons 2. Hazards in proximity to the work area 3. Complexity of the load handling activity 4. Adverse impacts from environmental conditions 5. Load Handling Equipment (LHE) and rigging capacity and/or performance 6. An adverse commercial impact Once a lift plan is completed, it is ready for the review process. The review serves to verify that the content of the plan is accurate and workable.
机译:计划负载处理和举升活动,然后进行审查,可以防止人员伤亡和财产损失,并使其降至最低。此外,审查会为所有参与或负责负载处理活动安全的人员提供指导。根据ASME P30,在编写电梯计划时应考虑以下内容。 1.对人员的潜在危险2.工作区域附近的危险3.负荷处理活动的复杂性4.环境条件的不利影响5.负荷处理设备(LHE)以及索具的容量和/或性能6.不利的商业行为影响提升计划一旦完成,就可以进行审核了。审查用于验证计划内容的准确性和可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号