On the 3rd of June, 2013, Sappi Alfeld commissioned Butting in Schwedt to produce and install the dry broke tower for the rebuild of its paper machine 2 (PM 2). Butting was also responsible in this project for the production of the entire process pipework and the steam and condensate pipelines. The dry broke tower made by Butting from stainless steel has a capacity of 475 m~3 and - including the stainless steel reinforcements - has a total weight of 16.5 tonnes. All in all, Butting supplied over three kilometres of pipeline for this project, 2.2 kilometres of which are made from stainless steel with diameters of between DN 15 and DN 500. The remaining pipes are made from stainless steel in sizes of between DN 15 and DN 125, as well as standard steel pipes.
机译:2013年6月3日,Sappi Alfeld委托Schwedt的Butting生产和安装干式破碎塔,以重建其2号纸机(PM 2)。 Butting在该项目中还负责整个过程管道以及蒸汽和冷凝水管道的生产。 Butting用不锈钢制成的干式破碎塔的容量为475 m〜3,包括不锈钢加强件在内的总重量为16.5吨。总而言之,Butting为该项目提供了超过3公里的管道,其中2.2公里由直径在DN 15至DN 500之间的不锈钢制成。其余的管道由DN 15至DN之间的不锈钢制成125,以及标准钢管。

著录项

  • 来源
    《APR》 |2014年第4suppla期|26-29|共4页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号