首页> 外文期刊>Automation in construction >Collaborative relationship discovery in BIM project delivery: A social network analysis approach
【24h】

Collaborative relationship discovery in BIM project delivery: A social network analysis approach

机译:BIM项目交付中的协作关系发现:一种社交网络分析方法

获取原文
获取原文并翻译 | 示例
           

摘要

A deeper understanding of collaboration among various stakeholders is imperative towards the success of the Building Information Modelling (BIM) enabled project delivery. A systematic research framework is proposed to properly analyze dynamic changes in stakeholders and their relationships by deploying social network analysis (SNA), assisting in stakeholder management. First, the work breakdown structure (WBS) is performed to organize a BIM project (i.e., rail project) into 4 levels: project name, stage, process, and activity. Second, different stakeholders are clarified based on the activity level over the whole project using interviews and surveys. Third, a project-level social network containing both the project ontology and stakeholders is established, from which cooperation information is then precisely extracted and stakeholder-level social networks with only stakeholders being nodes are created. Finally, SNA is carried out at both network- and node- levels. The results show that (i) It is feasible to mine the collaboration information between different stakeholders through a project-level social network, (ii) The most active and central actor in each stage is continually changing, and the degree centrality and betweenness centrality are polarized between the stakeholders, (iii) There is a trend for a central stakeholder to be active and a broker at the same time, such as architect (#3), BIM coordinator (#4), BIM modeler (#6), civil & structural engineer (#9), and mechanical & electrical engineer (#18), and (iv) BIM coordinator (#4) should be given more attention, especially from the tender stage on. The research can contribute to both theoretical and practical development (a) A new novel approach that could make the dynamic collaboration characteristics explicit was proposed with SNA, (b) A good knowledge of the dynamic collaboration attributes among different stakeholders in BIM-based rail projects could encourage a better project outcome.
机译:要使建筑信息模型(BIM)支持的项目成功交付,对各利益相关方之间的协作有更深入的了解是必不可少的。提出了一个系统的研究框架,以通过部署社交网络分析(SNA)来适当地分析利益相关者及其关系的动态变化,从而协助利益相关者的管理。首先,执行工作分解结构(WBS)将BIM项目(即铁路项目)组织为4个级别:项目名称,阶段,过程和活动。其次,根据整个项目的活动水平,通过访谈和调查来明确不同的利益相关者。第三,建立一个既包含项目本体又包含利益相关者的项目级社交网络,然后从中精确提取合作信息,并创建仅以利益相关者为节点的利益相关者级社交网络。最后,在网络和节点级别都执行SNA。结果表明:(i)通过项目级社交网络挖掘不同利益相关者之间的协作信息是可行的;(ii)每个阶段最活跃和最中心的参与者不断变化,程度中心和中间中心是利益相关者之间的两极分化;(iii)中央利益相关者和代理同时出现的趋势是活跃的,例如架构师(#3),BIM协调器(#4),BIM建模器(#6),民事和结构工程师(#9),机械和电气工程师(#18),以及(iv)BIM协调员(#4)应该给予更多关注,尤其是从招标阶段开始。该研究可为理论和实践发展做出贡献。(a)提出了一种新的新颖方法,可以通过SNA提出明确的动态协作特征;(b)对基于BIM的铁路项目中不同利益相关者之间的动态协作属性有很好的了解可以鼓励更好的项目成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号