...
【24h】

Delivery Time

机译:交货时间

获取原文
获取原文并翻译 | 示例
           

摘要

If 2013 was the year of two very important first flights, 2014 will have to be an important year of execution: Airbus has committed to delivering the first A350-900, Boeing will hand over the first stretched 787-9, and the first Bombardier CS100 is still officially due for entry into service. Airbus is facing a crucial 12 months as it enters the second half of the A350-900 flight-test program. Two aircraft, MSN1 and MSN3, are currently performing the tests, which Airbus says have been mostly successful so far. Following an initial phase of handling tests, Airbus has continuously moved into the part of the campaign that is addressing a long list of items required for certification.
机译:如果说2013年是两次非常重要的首飞之年,那么2014年将是重要的执行年:空中客车公司承诺交付首架A350-900,波音公司将交付首架加长型787-9,首架庞巴迪CS100仍将正式服役。空中客车进入A350-900飞行测试计划的下半年,将面临至关重要的12个月。目前有两架飞机分别是MSN1和MSN3,正在执行测试,空中客车公司称,到目前为止,大多数飞机已经取得了成功。在处理测试的最初阶段之后,空中客车公司不断进入活动的一部分,该活动针对认证所需的一长串物品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号