【24h】

Revised Ramp-Up

机译:修订版

获取原文
获取原文并翻译 | 示例
           

摘要

Sukhoi faces a tight timeframe in the coming months regarding the SuperJet regional aircraft, as it strives to meet an already delayed fall start to flight testing and even though only the first section of the aircraft has been built. The first SuperJet (formerly called the Russian Regional Jet) frame is slated to be completed in April and undergo static tests at the TsAGI research institute in Zhukovsky, near Moscow. Construction of the first flying prototype is expected to begin around the same time at the facility in Komsomolsk-on-Amur in the Russian Far East.
机译:Sukhoi在接下来的几个月中,就SuperJet支线飞机而言,面临着一个紧迫的时间表,因为它努力满足已经延迟的坠落开始进行飞行测试,即使只制造了第一架飞机。首架SuperJet(以前称为“俄罗斯支线喷气式飞机”)框架定于4月完成,并在莫斯科附近茹科夫斯基的TsAGI研究所进行静态测试。预计将在同一时间在俄罗斯远东阿穆尔河畔科姆索莫尔斯克的工厂开始建造首架飞行原型机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号