...
首页> 外文期刊>Aviation Week & Space Technology >MDA Seeks Two-Year Schedule Bump for New GBI Option
【24h】

MDA Seeks Two-Year Schedule Bump for New GBI Option

机译:MDA寻求新的GBI选件两年时间表

获取原文
获取原文并翻译 | 示例
           

摘要

Accelerated scheduling and exoatmospheric interceptor programs have a bleak track record over the past decade, but an impatient Pentagon leadership decided on March 10 to try it again. The Next-Generation Interceptor (NGI) will enter service as early as 2028, or up to two years faster than the previous "end of the decade" timeline for the long-delayed follow-on and replacement for the 20-year-old Boeing Ground-Based Interceptor (GBI), several defense officials informed Congress during a series of hearing appearances in mid-March.
机译:在过去的十年中,加速调度和大气外拦截器计划的成绩令人沮丧,但五角大楼领导层不耐烦的决定于3月10日再次尝试。下一代拦截器(NGI)最早将于2028年投入使用,比之前的“十年末”时间表快了两年之久,因为该飞机被推迟了很长时间,并取代了拥有20年历史的波音公司3月中旬,在一系列听证会上,几名国防官员将地面拦截器(GBI)通知了国会。

著录项

  • 来源
    《Aviation Week & Space Technology》 |2020年第6期|40-40|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号