...
首页> 外文期刊>Aviation Week & Space Technology >Inside Russia's Modernized Mi-28NM
【24h】

Inside Russia's Modernized Mi-28NM

机译:在俄罗斯的现代化MI-28nm内

获取原文
获取原文并翻译 | 示例
           

摘要

A decade-long effort to upgrade Russia's Mi-28N attack helicopter recently paid off with a Russian government order for 98 Mi-28NMs that calls for deliveries through 2027.The order was signed as part of a $16 billion package of 46 contracts that included the purchase of 76 Su-57 fighters to be delivered by the end of 2027.When the basic Mi-28N entered service, on Dec. 24,2009, Mil was tasked with Avangard-3, a thorough modernization. The Mi-28NM 701 prototype performed the first hovering at Mil's site in Tomilino on July 29, 2016, and the first flight on Oct. 13. In March 2019, it was briefly deployed to Syria.In April 2019, the Rostov-on-Don production facility completed the first Mi-28NM of an initial batch ordered in December 2017 of two helicopters for testing. This first version of the type was presented to selected visitors of the Army 2019 international military forum in Kubinka in June.The Mi-28NM (Item 296) has a list of significant upgrades. It received a new N025M radar mounted at the top of rotor's mast, a new OPS-28M Tor-M electro-optical turret carried in a much bulkier cylindrical housing under the nose, and a new pilot's SMS-550 turret that replaced the previous TOES-521. The crew received NSTsI-V helmet-mounted sight and display systems; testbed trials of the NSTsI-V were completed in early 2017 and the prototype was installed on the first Mi-28NM.
机译:十年努力升级俄罗斯的MI-28N攻击直升机最近以俄罗斯政府订单为98 MI-28NMS致电2027年呼吁交付的。该订单作为160亿元的46份合同的一部分签署了购买76名SU-57战士于2027年底送达。当基本的MI-28N进入服务时,2009年12月24日,MIL由Avangard-3任务,彻底的现代化。 MI-28nm 701原型在2016年7月29日首次在米利诺州的MIL的网站上进行了第一次悬停在Tomilino,并于10月13日的第一次航班。2019年3月,它将简要介绍给叙利亚。2019年4月,罗斯托夫 - 唐生产设施完成了两台直升机的2017年12月订购的第一个MI-28nm,用于测试。该类型的首次版本被提交给6月份陆军2019年国际军事论坛的参观者.MI-28NM(第296项)有一个重大升级列表。它收到了一个新的N025M雷达安装在转子桅杆顶部,这是一个新的OPS-28M Tor-M电光炮塔,在鼻子下方的宽宽圆柱形外壳中携带,以及更换前脚趾的新飞行员的SMS-550炮塔-521。机组人员接受了NSTSI-V头盔安装的视觉和显示系统; NSTSI-V的试验在2017年初完成,原型安装在第一个MI-28nm上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号