...
首页> 外文期刊>Aviation Week & Space Technology >Upgrades Bolster Launch Capability
【24h】

Upgrades Bolster Launch Capability

机译:升级Bolster启动功能

获取原文
获取原文并翻译 | 示例
           

摘要

More than $500 million in Air Force Eastern Range and 45th Space Wing upgrades to enable more rapid, cost-effective launch operations at Cape Canaveral and Kennedy Space Center received a baptism by fire last week by supporting major Titan and Delta launches and a space shuttle countdown—all in the span of four days. Thunderstorms near Pad 39A during the late phases of Discovery's initial countdown scrubbed a planned Aug. 9 shuttle liftoff, but additional attempts were planned late last week, depending upon the weather.
机译:上周,美国空军对东部范围和第45太空翼进行了超过5亿美元的升级,以支持卡纳维拉尔角和肯尼迪航天中心的更快速,更具成本效益的发射操作,上周通过支持泰坦和达美大型发射和航天飞机倒计时而受到了洗礼-全部在四天内。在发现号最初的倒数计时后期,Pad 39A附近的雷暴擦洗了计划中的8月9日航天飞机升空,但计划在上周晚些时候根据天气情况再进行尝试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号