...
首页> 外文期刊>Bridge design & engineering >Kama River bridge construction kicks off
【24h】

Kama River bridge construction kicks off

机译:卡马河大桥工程开工

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of a new bridge over the Kama River in the city of Tatarstan in Russia is due to start this month (August) after Italian contractor Pizarotti reached an agreement with the authorities of the Tatarstan Republic. The Italian company has already completed preliminary design of the project, which it is estimated will cost approximately US$330 million. The new crossing will be built in two stages, the first of which will be the main 1.6km-long bridge which is expected to be completed by the middle of 2018.
机译:在意大利承包商皮萨罗蒂(Pizarotti)与the斯坦共和国当局达成协议之后,俄罗斯over斯坦共和国卡马河上的新桥的建造工作将于本月(8月)开始。这家意大利公司已经完成了该项目的初步设计,估计将耗资约3.3亿美元。新的交叉路口将分两个阶段进行建设,第一阶段将是1.6公里长的主桥,预计将于2018年年中完成。

著录项

  • 来源
    《Bridge design & engineering》 |2017年第88期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号