...
首页> 外文期刊>Building journal Hong Kong China >Kowloon Southern Link KDB200- Austin Station & Tunnels
【24h】

Kowloon Southern Link KDB200- Austin Station & Tunnels

机译:九龙南环线KDB200-柯士甸站及隧道

获取原文
获取原文并翻译 | 示例
           

摘要

Leighton is the lead partner in the Link 200 joint venture that is responsible for the design and construction of the Austin Station and Tunnels which form a key section of MTR Corporation's Kowloon Southern Link project. The rail link will connect the West Rail Line and East Rail Line between Nam Cheong Station and East Tsim Sha Tsui Station.rnThe joint venture's scope of works includes the design and construction of: 1. The new underground Austin Station (a four level structure constructed within an internally braced perimeter wall formed by diaphragm walls up to 30 metres deep), including all building services.
机译:礼顿是Link 200合资企业的主要合作伙伴,该合资企业负责奥斯汀车站和隧道的设计和建设,这是地铁公司九龙南环线项目的关键部分。该铁路线将连接南昌站和尖沙咀东部站之间的西铁线和东铁线。合资公司的工作范围包括以下方面的设计和建设:1.新的奥斯汀地下车站(已建成的四层结构)在内部支撑的外围墙中,该外围墙由不超过30米深的隔板墙形成),包括所有建筑服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号