首页> 外文期刊>Electricity Today >THE CASE FOR TRANSMISSION
【24h】

THE CASE FOR TRANSMISSION

机译:传播的理由

获取原文
获取原文并翻译 | 示例
           

摘要

The aged U.S. power grid has received its report card. Unfortunately, the final cumulative grade-point average (GPA), determined by the American Society of Civil Engineers (ASCE), was not encouraging, with a dismal D+-a rating the U.S. power grid received four years ago. The ASCE assesses the state of the power grid every four years. The D+ grade should not be seen as an opportunity to point out the faults and assign blame, but rather as a reality check that much work and investments are needed to improve the current state of the power grid. Despite the low grade, utility executives have been paying attention to their assets. In fect, investment numbers have increased in recent years.
机译:老化的美国电网已收到其报告卡。不幸的是,由美国土木工程师学会(ASCE)确定的最终累积平均绩点(GPA)并不令人鼓舞,四年前美国电网对D + -a的评分令人沮丧。 ASCE每四年评估一次电网状态。 D +级不应被视为指出故障并指责的机会,而应作为现实检查,以改善当前的电网状况需要大量的工作和投资。尽管等级较低,公用事业主管仍在关注其资产。实际上,近年来投资数量有所增加。

著录项

  • 来源
    《Electricity Today》 |2014年第2期|4-4|共1页
  • 作者

    Phill Feltham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号