...
首页> 外文期刊>Electricity Today >AltaLink Turns To Xerox To Reduce Output Costs
【24h】

AltaLink Turns To Xerox To Reduce Output Costs

机译:AltaLink转向施乐以降低生产成本

获取原文
获取原文并翻译 | 示例
           

摘要

In 2002, AltaLink took control of Alberta's largest transmission system and became Canada's leading fully independent electricity provider. As power consumption has climbed 35 per cent over the last 10 years, AltaLink has plans to expand to meet the demand.rnAt the core of the business, AltaLink is committed to providing safe, reliable and affordable power transmission, and every aspect of the company is expected to perform with efficiency, safety and cost-effectiveness in mind including its office opera-rntions.
机译:2002年,AltaLink接管了艾伯塔省最大的输电系统,并成为加拿大领先的完全独立的电力供应商。在过去十年中,随着功耗的增长达到35%,AltaLink计划进行扩展以满足需求。在业务的核心,AltaLink致力于提供安全,可靠和负担得起的电力传输,以及公司的各个方面包括办公室操作在内,预期将在考虑效率,安全性和成本效益的情况下执行。

著录项

  • 来源
    《Electricity Today》 |2010年第4期|P.323436|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号