首页> 外文期刊>Electricity Today >STREAMLINING ENVIRONMENTAL APPROVALS FOR TRANSMISSION LINE MAINTENANCE
【24h】

STREAMLINING ENVIRONMENTAL APPROVALS FOR TRANSMISSION LINE MAINTENANCE

机译:简化传输线维护的环境审批

获取原文
获取原文并翻译 | 示例
           

摘要

Transmission line maintenance in a National Park can be a challenge: a challenge to obtain approvals, schedule work, and maintain good working relationships. AltaLink was faced with this challenge in Banff National Park. AltaLink's answer to this challenge was to develop a Model Class Screening Report. AltaLink owns and operates transmission power lines within Banff National Park, Alberta. All powerline maintenance activities require permits and often environmental screenings prior to starting project fieldwork. These requirements can result in uncertainty in scheduling maintenance work. Repetitively completing these reports for routine maintenance is a waste of time and money. AltaLink has streamlined and expedited this process by developing a Model Class Screening Report (MCSR).
机译:国家公园内输电线路的维护可能是一个挑战:获得批准,安排工作并保持良好的工作关系是一个挑战。 AltaLink在班夫国家公园面临着这一挑战。 AltaLink对这一挑战的答案是开发一个“模型类别筛选报告”。 AltaLink在艾伯塔省班夫国家公园内拥有并经营输电线路。在开始项目现场工作之前,所有电力线维护活动都需要获得许可,并且通常需要进行环境检查。这些要求可能导致安排维护工作的不确定性。重复完成这些报告以进行日常维护是浪费时间和金钱。 AltaLink通过开发模型类筛选报告(MCSR)简化并加快了该过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号