...
首页> 外文期刊>Electricity Today >NOW HERE'S A SWITCH...STANDARD COMPONENTS HELP HYDRO VAUGHAN DISTRIBUTION BUILD A BETTER RTU
【24h】

NOW HERE'S A SWITCH...STANDARD COMPONENTS HELP HYDRO VAUGHAN DISTRIBUTION BUILD A BETTER RTU

机译:现在,这是一个开关...标准组件可帮助建立更好的RTU的HYDRO VAUGHAN分布

获取原文
获取原文并翻译 | 示例
           

摘要

With a peak load of 575 MW, Hydro Vaughan Distribution Inc. (HVDI) serves 70,000 customers in the City of Vaughan, Ontario. A growing customer base has fuelled an increase in load requirements of 10 per cent, per year over the last three years. And, HVDI's recent joint acquisition of the neighboring City of Richmond Hill's hydroelectric system with Markham Hydro Distribution Inc. will further increase these requirements. Taking energy from the provincial power grid at 230 kV, HVDI's 10,000 distribution transformers stepped down the power to a utilization voltage of 28kV. With a mandate to deliver electricity reliably and profitably to their industrial, commercial and residential customers, HVDI relies on a network of remote terminal units (RTUs) to distribute power over a 110 square kilometer area.
机译:Hydro Vaughan Distribution Inc.(HVDI)的峰值负荷为575 MW,为安大略省沃恩市的70,000客户提供服务。在过去三年中,不断增长的客户基础推动了每年10%的负载需求增长。而且,HVDI最近与Markham Hydro Distribution Inc.联合收购了邻近的里士满希尔市的水力发电系统,将进一步提高这些要求。 HVDI从省级电网获得230 kV的能量,HVDI的10,000台配电变压器将电源降低到28kV的利用电压。 HVDI的任务是向其工业,商业和住宅用户可靠且盈利地供电,因此HVDI依靠远程终端单元(RTU)网络在110平方公里的区域内配电。

著录项

  • 来源
    《Electricity Today》 |2003年第6期|p.19-21|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号