首页> 外文期刊>Business Ethics >Afghanistan's Aynak copper deposit tender process: case study
【24h】

Afghanistan's Aynak copper deposit tender process: case study

机译:阿富汗的Aynak铜矿招标过程:案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This paper contributes to the literature of case studies about doing business in conflict zones and post-conflict zones by presenting the details of holding an international tender process in Afghanistan. The potential importance of Aynak to Afghanistan's economy is explained. The tender plan, rights offered, expectations and bid evaluation process for awarding the right to develop the Aynak copper deposit in Afghanistan are described in detail. This paper shows how an equitable, transparent, objective, standards-based process approach, incorporating technically and socially responsible development requirements, may be adopted and implemented in countries with difficult conditions.
机译:本文通过介绍在阿富汗举行国际招标程序的细节,为有关在冲突地区和冲突后地区开展业务的案例研究的文献做出了贡献。解释了Aynak对阿富汗经济的潜在重要性。详细描述了授予在阿富汗开发Aynak铜矿的权利的招标计划,提供的权利,期望和投标评估过程。本文说明了如何在条件困难的国家采用和实施一种公正,透明,客观,基于标准的过程方法,其中包括对技术和社会负责的发展要求。

著录项

  • 来源
    《Business Ethics》 |2012年第4期|p.364-379|共16页
  • 作者

    Simon Handelsman;

  • 作者单位

    Norman B. Keevil Institute of Mining Engineering, University of British Columbia, Vancouver, British Columbia, Canada;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号