首页> 外文期刊>Civil Engineering Surveyor >Anchor retaining wall for housing development infrastructure project
【24h】

Anchor retaining wall for housing development infrastructure project

机译:住房开发基础设施项目的锚固挡土墙

获取原文
获取原文并翻译 | 示例
           

摘要

The successful development of the £600m Ironstone housing scheme in Telford has been made possible with the help of an innovative retaining wall system from building materials manufacturer, Acheson & Glover Group.rnIronstone is a sustainable development of 3,300 houses, being built close to the village of Lawley, near Telford, Shropshire. The anticipated increased traffic levels generated by the schemes residents and service vehicles meant that major infrastructure work was needed within the area of the development to increase capacity.
机译:铁建公司(Acheson&Glover Group)的创新挡土墙系统使泰尔福德(Telford)6亿英镑的Ironstone住房计划的成功开发成为了可能洛普郡,特罗福,什罗普郡附近。计划的居民和服务车辆带来的交通量预计会增加,这意味着在开发区域内需要进行大型基础设施建设以增加容量。

著录项

  • 来源
    《Civil Engineering Surveyor》 |2009年第6期|45-45|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号