首页> 外文期刊>Civil Engineering >THE RIGHT COMBINATION
【24h】

THE RIGHT COMBINATION

机译:正确的组合

获取原文
获取原文并翻译 | 示例
           

摘要

More than a decade ago, Spokane County, Washington, determined that it had a critical need for additional wastewater treatment capacity, primarily to meet anticipated population growth, eliminate reliance on septic systems, and meet the effluent water quality requirements set by the Washington State Department of Ecology. Today, those needs are being met by the new Spokane County Regional Water Reclamation Facility (SCRWRF), a complex completed in 2012. The 8 mgd facility is improving water quality and the environment by reducing the levels of phos- phorus and other nutrients discharged into the Spokane River. Not only does it combine aesthetic characteristics appropriate to the region with state-of-the-art treatment technology and odor control; it also serves as a catalyst for revitalization of the area while being a good neighbor to existing businesses.
机译:十多年前,华盛顿州斯波坎县确定迫切需要额外的废水处理能力,主要是为了满足预期的人口增长,消除对化粪池系统的依赖以及满足华盛顿州制定的出水水质要求生态学。如今,斯波坎县新的地区用水开垦设施(SCRWRF)满足了这些需求,该设施于2012年完工。8 mgd的设施通过减少磷和其他养分的排放量来改善水质和环境。斯波坎河。它不仅将适合该地区的美学特征与最先进的处理技术和气味控制相结合;它也是该地区振兴的催化剂,同时又是现有企业的好邻居。

著录项

  • 来源
    《Civil Engineering》 |2013年第8期|58-63|共6页
  • 作者

    Dennis Nelson; Rick Smith;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号