...
首页> 外文期刊>Civil Engineering >Hybrid Extradosed Bridge Under Way in British Columbia
【24h】

Hybrid Extradosed Bridge Under Way in British Columbia

机译:不列颠哥伦比亚省的混合动力超速桥梁正在进行中

获取原文
获取原文并翻译 | 示例
           

摘要

Engineers designing a new bridge across the Fraser River in British Columbia had to develop a cost-effective solution that would traverse 968 m, accommodate two navigation channels, and have no more than five spans. Height restrictions imposed by the presence of a nearby airport limited the height of the pylons, ruling out such traditional solutions as cable-stayed and suspension bridges. So the engineers devised a 968 m long continuous hybrid extradosed bridge that will accommodate the long spans without needing extremely tall pylons.
机译:设计跨越不列颠哥伦比亚省弗雷泽河的新桥的工程师必须开发一种经济高效的解决方案,该解决方案将穿越968 m,可容纳两个导航通道,且跨度不超过五个。附近机场的存在限制了高度,从而限制了塔架的高度,排除了传统的解决方案,例如斜拉桥和悬索桥。因此,工程师们设计了968 m长的连续混合动力外加桥,可以容纳大跨度,而无需极高的塔架。

著录项

  • 来源
    《Civil Engineering》 |2006年第10期|p.28-30|共3页
  • 作者

    Karen Trimbath;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号