...
首页> 外文期刊>Civil Engineering >HIGHWAYS: Interchange to Fill Gap in Interstate 95
【24h】

HIGHWAYS: Interchange to Fill Gap in Interstate 95

机译:高速公路:互换以填补95号州际公路上的缺口

获取原文
获取原文并翻译 | 示例
           

摘要

A record of decision issued by the Federal Highway Administration has cleared the way for the design and construction of a long-awaited interchange between Interstate 95 and the Pennsylvania Turnpike (I-276). Although the two highways cross, in Bucks County, Pennsylvania, they have never been directly connected. By linking I-95 with the Pennsylvania Turnpike and from there to the New Jersey Turnpike, the project also fills a long-standing gap in I-95 in New Jersey, making the highway continuous through the Middle Atlantic region for the first time. Although only preliminary engineering has been done so far, the interchange design has been developed in much greater detail than is typical at this stage because the interchange is located in such a highly developed area, says Jay Roth, a senior associate and the division chief of the Bensalem, Pennsylvania, office of KCI Technologies, Inc., which carried out the environmental impact studies. "Minimizing socioeconomic impacts was the driving force behind the design," Roth says.
机译:联邦公路管理局(Federal Highway Administration)发布的决定记录,为人们期待已久的95号州际公路与宾夕法尼亚州收费公路(I-276)交汇处的设计和施工扫清了道路。尽管两条高速公路相交,但在宾夕法尼亚州的雄鹿县,它们从未直接相连。通过将I-95与宾夕法尼亚州收费公路相连,并从那里连接至新泽西收费公路,该项目还填补了新泽西州I-95长期存在的空白,使高速公路首次连续穿越中大西洋地区。尽管目前为止仅进行了初步的工程设计,但由于立交桥位于如此发达的地区,因此立交桥的设计比当前阶段的细节要详细得多。宾夕法尼亚州本萨勒姆市​​KCI Technologies,Inc.办公室进行了环境影响研究。罗斯说:“将社会经济影响降至最低是设计的原动力。”

著录项

  • 来源
    《Civil Engineering》 |2004年第3期|p.22-23|共2页
  • 作者

    Jeff L. Brown;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号