...
首页> 外文期刊>Civil Engineering >Replacement Strategy
【24h】

Replacement Strategy

机译:更换策略

获取原文
获取原文并翻译 | 示例
           

摘要

Faced with an aging water treatment plant, the city of Detroit devised an innovative design/build/maintain program for a new plant that is attracting attention nationwide. Waterworks Park II, a $275-million water treatment plant currently under construction in Detroit, is redefining the way that such projects are let and built. In fact, the project delivery program established for the plant, which is scheduled for completion in 2003, is putting the city on the water treatment map, so to speak. "We're getting calls from all over the world," boasts Awni Qaqish, the assistant director of engineering for the Detroit Water and Sewerage Department (DWSD). "Detroit is way ahead of the curve."
机译:面对老化的水处理厂,底特律市为新厂设计了一项创新的设计/建造/维护计划,该计划正在全国范围内引起关注。底特律正在兴建的耗资2.75亿美元的水处理厂二号水厂公园(Waterworks Park II)正在重新定义此类项目的出租和建造方式。实际上,可以说,为该工厂制定的项目交付计划(计划于2003年完成)使该城市处于水处理地图上。底特律水和污水处理部门(DWSD)的工程助理总监Awni Qaqish自豪地说:“我们接到了来自世界各地的电话。” “底特律领先于弯道。”

著录项

  • 来源
    《Civil Engineering》 |2001年第8期|48-53|共6页
  • 作者

    Ray Bert;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号