首页> 外文期刊>CIWM >Blind Data
【24h】

Blind Data

机译:盲数据

获取原文
获取原文并翻译 | 示例
           

摘要

New capacity is still needed to help continue the shift to becoming a zero waste to landfill society - the first step to ultimately becoming a zero waste (or truly circular economy) society. For this to happen the hurdle of securing planning consent must first be cleared. The existence of up-to-date, local waste plans can go a long way to supporting the case for new waste management facilities. Without an up-to-date plan, prospective developers must justify the need for each facility, and the validity of this need must then be assessed by the determining planning authority on a case-by-case basis. In addition, for facilities to actually get built, finance needs to be secured, and the likelihood of securing finance is greatly improved by a business case underpinned by a sound understanding of the need for new capacity.
机译:仍然需要新的能力来帮助继续向垃圾填埋社会转变为零废物的第一步,这是最终成为零废物(或真正的循环经济)社会的第一步。为此,必须首先清除获得计划同意的障碍。最新的本地废物计划的存在可以为支持新的废物管理设施提供支持。如果没有最新计划,则潜在的开发人员必须证明对每种设施的需求是合理的,然后必须由确定的计划授权机构逐案评估这种需求的有效性。另外,对于实际建造的设施,需要确保资金,并且通过对新能力的需求有深刻的了解来支撑业务案例,从而大大提高了获得资金的可能性。

著录项

  • 来源
    《CIWM》 |2015年第4期|40-41|共2页
  • 作者

    Alan Potter;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号