首页> 外文期刊>CIWM >Keep The Lights Onl
【24h】

Keep The Lights Onl

机译:保持开灯

获取原文
获取原文并翻译 | 示例
           

摘要

The Coalition Government has withdrawn outline PFI funding for three major waste projects (all including thermal recovery), having deciding they are not needed to meet 2020 landfill diversion targets. But rather than this somewhat piecemeal approach to capacity, there is a need for much more strategic national focus where securing future UK energy supply is concerned, to enable the full energy potential of residual waste to be exploited via heat networks. Highly efficient multi-fuelled merchant energy from waste (EfW) infrastructure, whilst not a panacea, could play a significant role in meeting our future energy needs. The challenges to doing so are not technical, but include historical policy inertia (surrounding energy efficiency) and highly polarised views surrounding the EU's Waste Hierarchy.
机译:联盟政府已决定不再需要三个主要废物项目的PFI资金(全部包括热能回收),并决定不需要它们来实现2020年垃圾填埋场转移目标。但是,除了采用这种零星的容量处理方法外,还需要在确保未来英国能源供应方面更具战略性的国家重点,以确保通过热网充分利用残余废物的潜在能源。来自废物(EfW)基础设施的高效多燃料商业能源,虽然不是万能药,但可以满足我们未来的能源需求。这样做的挑战不是技术性的,而是包括历史上的政策惯性(围绕能源效率)和围绕欧盟废物等级制的高度两极化的观点。

著录项

  • 来源
    《CIWM》 |2013年第4期|3638|共2页
  • 作者

    Stuart McLanaghan;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号