首页> 外文期刊>CIWM >The City-To-City Solution?
【24h】

The City-To-City Solution?

机译:城市到城市的解决方案?

获取原文
获取原文并翻译 | 示例
           

摘要

AEB waste to energy company is wholly owned by the City of Amsterdam. Its main purpose is to handle the vast majority of municipal waste from the city of Amsterdam and 19 municipalities in its surroundings. The plant was expanded in 2007 to allow an annual throughput of over 1.4m tonnes of waste. The energy from waste (EfW] facility in Amsterdam is the largest, most durable and energy efficient EfW in the world, and includes a state-of-the-art energy power station with an electricity production efficiency of more than 30 percent, which is higher than the average of other European EfW facilities. It is one of the overseas facilities mat is able to treat UK waste and currently treats 300 000 tonnes annually (refuse derived fuel from both commercial and household waste). It is situated in the port of Amsterdam with its own facilities, allowing easy access by ship from the UK.
机译:AEB废物转化能源公司由阿姆斯特丹市全资拥有。其主要目的是处理来自阿姆斯特丹市及其周围19个城市的绝大多数城市垃圾。该工厂于2007年进行了扩建,使其年吞吐量超过140万吨。阿姆斯特丹的废物能源(EfW)设施是世界上最大,最耐用和最节能的EfW,其中包括最先进的能源发电站,其发电效率超过30%,该设施位于欧洲港口,是欧洲能够处理英国废物的设施之一,能够处理英国废物,目前每年处理30万吨(拒绝来自商业和家庭废物的衍生燃料)。阿姆斯特丹拥有自己的设施,可轻松从英国乘船前往。

著录项

  • 来源
    《CIWM》 |2013年第11期|26-27|共2页
  • 作者

    Jaap Pranger;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号