首页> 外文期刊>Wastes Management >Demonstrating its Success
【24h】

Demonstrating its Success

机译:展示其成功

获取原文
获取原文并翻译 | 示例
           

摘要

We have been waiting a long time for the first demonstration plant to reach 100 percent working capacity - two years, in fact. And just like London buses two come along at once. The Ludlow-based Greenfinch/South Shropshire anaerobic digester will reach 100 percent capacity in June and will begin taking visitors shortly after. The facility will produce biogas for energy production from 5000 tonnes of source segregated kitchen waste. Just a few miles away in Leominster, Bioganix is already processing green waste in its in-vessel composter. Its visitor centre will also open late June/ early July.
机译:实际上,我们已经等了很长时间了,第一个示范工厂要达到100%的工作能力-实际上是两年。就像伦敦的公共汽车一样,有两辆汽车同时出现。基于Ludlow的Greenfinch / South Shropshire厌氧消化池将于6月达到100%的产能,并将在不久后开始吸引游客。该设施将从5000吨的源头分类厨房垃圾中生产沼气,以生产能源。在Leominster仅有几英里远的地方,Bioganix已经在其堆肥机中处理绿色废物。其游客中心也将于6月下旬/ 7月初开放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号