...
首页> 外文期刊>Construction Europe >Massive Olympic complex is underway in capital city
【24h】

Massive Olympic complex is underway in capital city

机译:首都奥林匹克运动场正在建设中

获取原文
获取原文并翻译 | 示例
           

摘要

The Olympic Complex in Ashgabat, Turkmenistan, is considered among the largest building construction projects underway in the world today. Developed over three phases, the 1.57km~2 site in the southern part of the capital city, and comprises seven major indoor sporting venues with capacities from 5,000 to 45,000 spectators. Also included in the project are outdoor facilities, hotels, restaurants, car parks, an Olympic Village with capacity for 12,000 competitors and a 5km monorail to connect them all together. In all there are 52 major construction schemes within the overall project.
机译:土库曼斯坦阿什哈巴德(Ashgabat)奥林匹克综合体被认为是当今世界上正在进行的最大的建筑项目之一。该项目分三期开发,位于首都南部1.57km〜2,包括七个主要的室内运动场馆,可容纳5,000至45,000名观众。该项目还包括室外设施,酒店,饭店,停车场,一个可容纳12,000名运动员的奥运村和一条5公里的单轨铁路,将它们连接在一起。在整个项目中,总共有52个主要的建设计划。

著录项

  • 来源
    《Construction Europe》 |2015年第3期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号