...
首页> 外文期刊>Construction Management and Economics >Using the IKEA model and virtual prototyping technology to improve construction process management
【24h】

Using the IKEA model and virtual prototyping technology to improve construction process management

机译:使用宜家模型和虚拟原型技术改善施工过程管理

获取原文
获取原文并翻译 | 示例
           

摘要

Learning from manufacturing industries is a useful approach to improving the productivity of the construction industry and to solve problems arising from construction processes. Through the use of virtual prototyping (VP) technology, the lean production process engaged in the IKEA business model (IKEA model) is studied and implemented in a real-life construction project. Specifically, based on the analysis of the IKEA model, the IKEA model can be applied to optimize construction processes and simplify management activities. A case study is analysed to demonstrate the improvement of construction process management through using the VP-IKEA approach.
机译:向制造业学习是提高建筑业生产率和解决建筑过程中出现的问题的有用方法。通过使用虚拟原型(VP)技术,研究和实施参与宜家业务模型(IKEA模型)的精益生产过程,并将其应用于现实生活中的建设项目中。具体而言,基于对宜家模型的分析,宜家模型可用于优化施工过程并简化管理活动。分析了一个案例研究,以证明使用VP-IKEA方法可以改善施工过程管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号