Significant factors causing delay in the UAE construction industry

机译:导致阿联酋建筑业延迟的重要因素

获取原文
获取原文并翻译 | 示例
           

摘要

Construction delay is considered one of the most recurring problems in the construction industry. Delays have an adverse impact on project success in terms of time, cost, quality and safety. The effects of construction delays are not confined to the construction industry only, but influence the overall economy of a country like UAE, where construction plays a major role in its development and contributes 14% to the GDP. Thus, it is essential to define the most significant causes of delay in order to avoid or minimise their impact on construction projects. A detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry. The perspective of contractors and consultants has been analysed to rank the causes of delays based on their Relative Importance Index. Contractors and consultants were in agreement on the most significant causes of delays. The research revealed that 50% of the construction projects in UAE encounter delays and are not completed on time. The top 10 most significant causes of construction delays have been identified by this research. Approval of drawings, inadequate early planning and slowness of the owners' decision-making process are the top causes of delay in the UAE construction industry.
机译:施工延迟被认为是建筑行业中最经常发生的问题之一。延迟在时间,成本,质量和安全性方面对项目成功有不利影响。建筑延误的影响不仅限于建筑业,还影响到阿联酋这样的国家的整体经济,阿联酋在建筑业的发展中起着重要作用,对GDP的贡献为14%。因此,必须确定最主要的延误原因,以避免或最大程度地减少对建设项目的影响。开发了一份详细的调查表,并用于从与阿联酋建筑业相关的专业人员那里获得意见。对承包商和顾问的观点进行了分析,以根据其相对重要性指数对延迟原因进行排名。承包商和顾问就延误的最重要原因达成了一致。研究表明,阿联酋有50%的建设项目遇到延误,无法按时完成。这项研究确定了施工延误的十大最重要原因。图纸的批准,不充分的早期计划以及业主决策过程的缓慢是造成阿联酋建筑业延误的主要原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号