首页> 外文期刊>Construction News >Bam and Skanska flexi-working trial a 'success'
【24h】

Bam and Skanska flexi-working trial a 'success'

机译:Bam和Skanska Flexi-Working审判A'成功'

获取原文
获取原文并翻译 | 示例
           

摘要

Four pilot projects have found that flexible-working practices for tradespeople can work, after successful trials at Skanska's HS2 site, as well as on Bam and Willmott Dixon jobs. The projects tested a range of flexible-working options for site staff, encompassing manual and white-collar workers, such as engineers and project managers. Consultancy Timewise, which managed the pilots, found workers reported better wellbeing. The study, which took place between June 2020 and February 2021, also found that the changes to working practices had no negative impact on project budgets or timeframes. Timewise director Emma Stewart said the study should drive a change in working practices: "Our trailblazing pioneers, Bam Construct, Bam Nuttall, Skanska UK and Willmott Dixon, have shown that wellbeing and balance should be possible to achieve forthe whole workforce - not just those in office roles, and in doing so have provided a blueprint that we hope will drive wider industry change."
机译:在Skanska的HS2网站以及Bam和Willmott Dixon Jobs的成功试验之后,有四项试点项目可以在成功试验后,努力工作。 该项目测试了一系列服务场地工作人员的灵活工作选项,包括手动和白领工,如工程师和项目经理。 咨询时间,管理飞行员,发现工人报告了更好的福祉。 该研究发生在2020年6月20日和2021年2月,还发现,工作实践的变化对项目预算或时间框架没有负面影响。 TimeWise Director Emma Stewart表示,该研究应该推动工作实践的变化:“我们的开拓者先锋,Bam Construct,Bam Guittall,Skanska UK和Willmott Dixon,表明,应该可以实现整体劳动力 - 不仅仅是那些 在办公室角色,在这样做,所以提供了我们希望推动更广泛的产业变革的蓝图。“

著录项

  • 来源
    《Construction News》 |2021年第7623期|6-6|共1页
  • 作者

    David Price;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号