【24h】

Arla invests in UK sites

机译:Arla投资英国工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Arla Foods UK plans to invest approximately £37.5 million (€43.9m) in its UK sites and logistics in 2017, an increase of 51% from 2016. The UK figure is part of the £285 million investment Arla expects to make at sites around the world. It is moving more milk from bulk into branded, own label and foodservice sales. Overall, investment is nearly 50% more compared to last year and one of the highest ever single-year supply chain investment in the company's history. The money will be spread across Aria's 13 UK production, packing and distribution sites along with its logistics. These include: • Taw Valley creamery will see £5m (€5.8m) to develop capacity to support product quality for its hard cheeses such as cheddar, Red Leicester and Double Gloucester.
机译:Arla Foods UK计划在2017年在其英国工厂和物流业投资约3750万英镑(4390万欧元),比2016年增长51%。英国的数字是Arla预计在其工厂附近投资2.85亿英镑的一部分世界。它将更多的牛奶从散装转移到品牌,自有品牌和餐饮服务销售中。总体而言,投资额比去年增加了近50%,是公司历史上有史以来最高的单年供应链投资之一。这笔钱将分布在Aria在英国的13个生产,包装和分销地点以及其物流中。其中包括:•Taw Valley乳品厂将获得500万英镑(580万欧元)的开发能力,以支持其切达干酪,红莱斯特和Double Gloucester等硬质奶酪的产品质量。

著录项

  • 来源
    《Dairy industries international》 |2017年第3期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号