...
首页> 外文期刊>Dams and reservoirs >Low level outlets 3: British Waterways' approach
【24h】

Low level outlets 3: British Waterways' approach

机译:低层网点3:英国水运公司的做法

获取原文
获取原文并翻译 | 示例
           

摘要

British Waterways' portfolio of old dams is described and contemporary valve layouts are discussed. The risks associated with such layouts are reviewed as are recent recommendations by inspecting engineers for mitigating these risks. British Waterways' emergency drawdown policy is stated and three recent examples of pipelining are described. Finally, lessons learnt by British Waterways from the Boltby and Ulley incidents are summarised.
机译:描述了英国水运公司的旧水坝项目,并讨论了现代阀门布局。检查工程师对与此类布局相关的风险进行了审查,最近又提出了建议,以减轻这些风险。陈述了英国水运公司的紧急缩水政策,并描述了三个最近的流水线实例。最后,总结了英国水道局从博尔特比和乌利事故中汲取的教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号