首页> 外文期刊>Decision Sciences >A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops
【24h】

A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops

机译:作业车间中基于负载和面向日期的订单查看/发布方法

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, a new order review/release (ORR) method is proposed for shop floor control systems. The proposed method utilizes both job due date and shop load information to improve the effectiveness of the ORR function in production systems. The performance of the new method is compared to those of a few well-known ORR methods under four experimental conditions. The results of extensive simulation experiments indicate that the proposed method is superior with respect to the mean absolute deviation measure. In general, it is also better than existing methods for the other performance measures. Furthermore, we show that the proposed method is more robust to variations in system load and processing times than the other ORR methods examined.
机译:本文针对车间控制系统提出了一种新的订单复核/下达(ORR)方法。所提出的方法利用工作截止日期和车间负荷信息来提高生产系统中ORR功能的有效性。在四个实验条件下,将该新方法的性能与一些著名的ORR方法的性能进行了比较。大量模拟实验的结果表明,相对于平均绝对偏差测度,该方法具有优越性。通常,对于其他性能度量,它也比现有方法更好。此外,我们表明,与其他ORR方法相比,该方法对系统负载和处理时间变化的适应性更强。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号