...
首页> 外文期刊>Advances in Mechanical Engineering >A multi-agent-based system for two-stage scheduling problem of offshore project:
【24h】

A multi-agent-based system for two-stage scheduling problem of offshore project:

机译:基于多主体的海上项目两阶段调度系统:

获取原文
           

摘要

Aimed at enhancing the effectiveness and efficiency for offshore project scheduling, the mathematical model of two-stage scheduling is proposed according to the offshore project characteristics discussed in this article, which is used to solve the scheduling problem of large-scale and complex project. Regarding the two-stage scheduling, a system framework with multi-agent technology is presented to facilitate the integration and cooperation of offshore project scheduling. Next, the functional definition and internal structure of each intelligent agent is designed. Moreover, two kinds of intelligent algorithms have been designed to solve the resource conflicts and task assignment, respectively. Finally, the prototype system is developed to test the feasibility and rationality.
机译:为了提高海上项目调度的有效性和效率,针对本文讨论的海上项目特点,提出了两阶段调度数学模型,用于解决大型复杂项目的调度问题。对于两阶段调度,提出了一种采用多智能体技术的系统框架,以促进海上项目调度的集成与协作。接下来,设计每个智能代理的功能定义和内部结构。此外,设计了两种智能算法分别解决资源冲突和任务分配。最后,开发了原型系统以测试可行性和合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号