> Problem Statement: Useful life of winding isolation is about 30 years. It can be reduced when it is submitted to overloads or when it is worked in aggressive environments. Approach: When retrofit is done, an increasing to superior isolation class is recommendable. So, generator capacity can be increased and pay back could be excellent justifying the investment. Result: Several Brazilians experiences successfully showed the retrofit with repower, for example many GE generators at Henry Borden Power Plant in Cubat?o, S?o Paulo, whose power had increased up to 50%. This study aimed at presenting two cases of rewound with repower, changing the old insulating materials by other modern ones in substantial increases of power about 30%. The discussion also included how to determine the new power obtained after the repower and before the load tests. In large machines, the load tests are accomplished with machine connected with network power system and they needed special attention and care. In other words, they are critical tests. The calculations of the field current of full load generator for determining field temperature elevation, indirect tests (no load) are done. Which are the methods that present reliable results? Conclusion: This study showed a confrontation among three studied methods, ASA, IEEE 115 and General Method with their theoretical analyze. ASA method was normalized in many countries; in Brazilian showed in NBR-5052. In IEEE 115, the method is named Phasor Diagram Analysis-Salient-pole Machines. General Method is an academic treatment with better theoretical explanation.
机译: > 问题陈述:绕组隔离的使用寿命约为30年。当它承受过载或在恶劣环境下工作时,可以减少它。 方法:改造完成后,建议将隔离级别提高到高级。因此,可以增加发电机容量,并可以很好地收回投资来证明投资的合理性。 结果:巴西人的一些经验成功地证明了对电力的改造,例如,圣保罗的库巴托的亨利·博登发电厂的许多GE发电机的功率提高了50%。这项研究的目的是介绍两例带电的绕线机,将旧的绝缘材料换成其他现代的绝缘材料,使功率大幅度提高约30%。讨论还包括如何确定在重新加电之后以及负载测试之前获得的新功率。在大型机器中,负载测试是通过与网络电源系统相连的机器完成的,需要特别注意和注意。换句话说,它们是关键测试。为了确定现场温度升高,进行了满载发电机的现场电流的计算,进行了间接测试(无负载)。哪些方法可以提供可靠的结果? 结论:本研究从理论上分析了ASA,IEEE 115和通用方法这三种研究方法之间的对立。 ASA方法在许多国家已标准化;在巴西的NBR-5052中显示。在IEEE 115中,该方法称为相量图分析-凸极机。通用方法是一种具有较好理论解释的学术方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号